Protective circuit functional testing, including lockout relay testing, must take place immediately upon installation, every 2 years thereafter, and upon any change in wiring. THEY SHOULD BE GIVEN FIRST LINE MAINTENANCE ATTENTION. ” relay may only need to operate for 0. But failure to operate as intended can result in extensive damage, extended power outages, and loss of life. NETA. The testing and verification of relay protection devices can be divided into four groups: Type tests are needed to prove that a protection relay meets the claimed specification and follows all relevant standards. Acceptance tests fall into two categories : (i) On new relays which are to be used for the first time. Features: Durable with no moving parts, ideal for modern grids.